Project
Study Reports and
Feasibility Studies
MRO Engineers' staff have prepared Project Study Reports, Project
Reports, and Feasibility Studies for new and modified
interchanges, freeway and roadway widenings, pedestrian/bicycle
overcrossings,
traffic
circles,
and grade separations. The projects have included the following
multi-disciplinary issues:
- Roadway
Design
- Utility
Relocation
- Traffic
Engineering
- Transportation
Planning
- Funding
Acquisition
- Public
Outreach
- Right-of-Way
Engineering
- Traffic
Signal Design
- Bridge
Design
|
- Advance
Planning Study
- Hydraulic
Analysis
- Access
Control
- Railroad
Coordination
- Caltrans
Coordination
- Alternatives
Analysis
- Cost
Estimation
- Safety
Enhancements
- Environmental
Review
|
Project
Study Report/Project Report Experience:
 |
State
Route 36 Widening Project Study Report
Lassen County, CA
"Fast-Track" Project Study Report for the widening
of 2 miles of State Route 36, including bridge widenings,
lengthening
of two box culverts, and modifications to two signalized
intersections. |
Plaza
Drive Widening Project Study Report
Visalia, CA
Prepared the "Fast-Track" Project Study Report for
the widening of Plaza Drive from 2 to 4 lanes, including the
modification of the Plaza Drive/State Route 198 interchange. |
|
 |
Bieber
Lookout Road Resurfacing Project Study Report
Lassen County, CA
Fast-track Project Study Report, design services, and a full
plans, specifications and estimate package for the resurfacing
of 5 miles of Bieber Lookout Road. |
| Coast
Village Road Project Study Report
Santa Barbara, CA
Fast-track Project Study Report, for the installation of
a round about at the Olive Mill Drive intersection with Coast
Village Road and State Route 101. |
|
| |
Union
Valley Parkway at SR 101 Project Study Report
Santa Maria, CA
"Fast-track" Project Study Report for a new interchange
at Highway 101. The study examined 21 alternative alignments,
including both undercrossing and overcrossing options. |
| County
Road A-1 Project Study Report
Lassen County, CA
Prepared the Project Study Report for County Road A-1
in Lassen County. The study of this 14 mile long roadway
in the pristine Eagle Lake area examined many roadway alignments
to bypass the summit of the mountain. |
|
| |
Academy
Avenue Alignment Study
Fresno, CA
Conducted an alignment study to evaluate alignment and widening
alternatives along this nine-mile project to determine the
most appropriate scenario for each segment. |
|
Los Carneros Widening Project Study Report
Goleta, CA
Prepared the "fast-track" Project Study Report for
the widening
of this structure to increase the capacity of the State Route
101/ Los Carneros Road southbound ramp terminal intersection.
|
|
| |
Mojave
Drive Widening at Interstate 15 Project Report
Victorville, CA
Prepared a combined Project Study Report/Project Report for
the widening of Mojave Drive at Interstate 15 to provide additional
capacity at the Mojave Drive interchange. |
| Lemen
Avenue Realignment Study
Woodland, CA
Conducted the Alternatives Analysis, and developed the conceptual
design, for the realignment of Lemen Avenue on both its east
and west ends. |
|
| |
County
Road A-3 Project Study Report
Lassen Coutny, CA
"Fast-track" Project Study Report for the widening
of 8.5 miles of this roadway in rural Lassen County. The
project
examined various roadway alignments and widening options. |
| SR
65/North Grand Ave Project Study Report
Porterville, CA
Prepared the "Fast-Track" Project Study Report for
a new grade-separated interchange which examined many structure
types, including a pre-cast, prestressed concrete slab alternative. |
|