West Las Palmas Bridge Replacement
Fullerton, CA

Provided Resident Engineer/Bridge Representative services for this HBRR-funded 120 foot long by 40 foot wide, cast-in-place, prestressed concrete box girder bridge replacement project.

 

Back to Construction Management

Traffic Engineering | Project Study Reports | Civil Design | Bridge Design | Site Development | Land Development
Construction Management
© 2010 MRO Engineers. All rights reserved.