Capay Bridge Replacement
Yolo County, CA

Provided construction management services for this 444 foot long by 33 foot wide 3-span, cast-in-place post-tensioned concrete box girder bridge replacement project.

 

Back to Construction Management

Traffic Engineering | Project Study Reports | Civil Design | Bridge Design | Site Development | Land Development
Construction Management
© 2010 MRO Engineers. All rights reserved.