![]() |
![]() |
|||||||||
![]() |
||||||||||
|
Hollister Avenue Bridge Replacement Santa Barbara, CA Provided Resident Engineer, Bridge Representative, and Inspection services for this 82 foot long by 102 foot wide two-span prestressed concrete voided slab bridge. |
||
© 2010 MRO Engineers. All rights reserved. |
|||