![]() |
![]() |
||||||||||||||
![]() |
|||||||||||||||
|
Hollister Avenue Bridge Replacement Santa Barbara, CA Provided Resident Engineer, Bridge Representative, and Inspection services for this 82-foot-long by 102-foot-wide two-span prestressed concrete voided slab bridge. |
||
© 2010 MRO Engineers. All rights reserved. |
|||