![]() |
![]() |
|||||||||
![]() |
||||||||||
|
Tahoe Donner Pavement Repair Truckee, CA Provided construction management services for the reconstruction of approximately 800 feet of roadway, and installation of 1,600 feet of underdrains. This roadway is located in an environmentally sensitive area which made extensive environmental mitigation controls necessary during construction. |
||
© 2010 MRO Engineers. All rights reserved. |
|||