![]() |
![]() |
|||||||||
![]() |
||||||||||
|
West El Camino Avenue Widening Provided design services for the widening of West El Camino Avenue just west of the bridge over the Natomas Drainage Canal to the Orchard Lane Intersection. This “fast track” design included storm drain improvements, new street lights and signal modification. |
||
© 2010 MRO Engineers. All rights reserved. |
|||